The fourth phase of the Yangshan Port will initially be able to
handle 4 million TEUs after it enters full operation, which will help
consolidate Shanghai port's position as the world's leading port.
So far, the equipment that has been put into trial operation includes
10 bridge cranes, 40 rail-mounted gantry cranes and 50 AGVs. The
project will eventually be equipped with 26 bridge cranes, 120
rail-mounted gantry cranes and 130 AGVs.
source:http://www.chinadaily.com.cn/a/201712/11/WS5a2df96fa310eefe3e9a2716_1.html
|