中文 | Homepage
Login | Contact Us
Search
loading...
Industrial Updates
International Shipping
Domestic Shipping
Ports
Logistics
International Shipping Center
China Shipping Prosperity Index
Global Port Development
China Shipping & Ports
International Cooperation Department
Tel.: (+86-21) 65853850-8034
Fax: (+86-21) 65373125
E-mail: ICDept@sisi-smu.org
International Shipping
Changi Budget Terminal closes Sept 25, to be replaced by Terminal 4SINGAPORE'S Changi
Date:2012-03-05 Readers:

    Airport Group (CAG) will close it's Budget Terminal for demolition on September 25, 2012 to make way for the construction of a larger passenger building, Terminal 4, to cater for continued growth at the airport.
    To facilitate the construction of Terminal 4, airlines operating in the Budget Terminal will
transfer to Terminal 2 from 6am September 25. Affected airlines are Berjaya Air, Cebu Pacific, Firefly, South East Asian Airlines and Tiger Airways.
    The new terminal, to be known as Terminal 4, will have a capacity of 16 million passengers a
year with a design to enhance quick turnaround of passengers from aircraft without the use of aerobridges. Construction of the terminal will begin in 2013 and to be operational by 2017.
    CAG has had discussions with the airlines operating at the Budget Terminal since late last year
regarding the terminal's closure. It will work with the respective airlines to ensure a smooth transition of their operations, and will endeavour to minimise inconvenience to passengers as far as possible.

(source:shipping online)

Back:  Asia-Europe freight rates continue to fall 4.4pc to US$1,747 per TEU
Next:  OOCL intra-Asia BAF increases to India, Pakistan, Mideast
China Shipping Database
China Shipping Database
Shipping Market Analysis
 
 
Copyright © 2008-2015 Shanghai International Shipping Institute (SISI) All Rights Reserved. Support by sk-vision & boondns. 沪ICP备05052059号-7