|
Apr.16--THE #17 and #18 berths at the Port of Dalian's Dayaowan harbour area have completed and passed inspection by China's Ministry of Transport, Xinhua reports.
The two berths are equipped with eight quay cranes, 24 rail-mounted gantry cranes and 40 container tow trucks, each has a capacity of 100,000 tonnes, able to handled 1.3 million TEU per year.
The two berths started construction in March 2005 and began trial operation in July 2008.
(Source:Shippingazette) |